Planning When the Metric That Matters Isn't on the P&L

SaaS health now lives in ARR, NRR and Rule of 40, not the P&L. See why FP&A struggles to plan around them and how Mercur connects it all in one model.

TECHNOLOGY AND SAAS FP&A Blog for CFO

Planning When the Metric That Matters Isn’t on the P&L 

Technology and SaaS CFOs plan around numbers that barely existed a decade ago, and the numbers themselves are moving against them. Benchmarkit’s 2025 B2B SaaS Performance Metrics Benchmarks, based on 583 companies, found that net revenue retention has fallen to a median of 101%, down from 105% a few years earlier, while gross revenue retention sits at 91%. Expansion ARR, revenue won from existing customers rather than new logos, now makes up 40% to 67% of total new ARR depending on company size. For the CFO, that means the health of the business increasingly lives inside a metric that never touches the statutory P&L, and has to be tracked, modelled and explained on its own terms. 

That tracking problem sits squarely with the Head of FP&A, and the tools available today are not built for it. Gartner’s CFO priorities research (10 Dec 2025, n>200) found cost optimisation is the single highest ranked priority for 2026 ad 2027, cited by 56% of CFOs, with forecast accuracy close behind at 51%. Yet the FP&A Trends Group’s 2025 benchmarks found only 17% of organisations run a fully driver-based planning model, the kind needed to connect headcount, cloud infrastructure cost and sales capacity to an ARR or Rule of 40 target. The same benchmarks found 46% of FP&A time still goes on collecting and validating data rather than analysing it, and 29% of organisations need more than ten days to produce a forecast at all. An ARR waterfall rebuilt by hand every month in a spreadsheet is not a planning process. It is a monthly fire drill. 

Margin visibility is the next layer of the same problem, and it falls hardest on the Head of Business Control. Maxio’s 2025 SaaS benchmarks found that the median contract length for annual SaaS deals has grown to 15.8 months, up from 13.1 months three years earlier, and that multi-year contracts now make up 40% of new deals compared with just 14% two years prior. Usage-based and hybrid pricing is also spreading fast across the same contract base. Every one of those structures bundles revenue, cost to serve and committed future obligations together in ways a standard chart of accounts was never built to separate. Forrester’s research on data-driven decision making (15 Jul 2024) found that nearly a third of organisations that rarely use data to decide simply say people trust their gut more, and in technology that instinct is often standing in for a margin number finance genuinely cannot produce fast enough to challenge it. 

Business partnering itself does not scale under this weight either. Gartner (23 Apr 2024, n=273 FP&A leaders plus 102 senior decision makers) found only 15% of FP&A leaders have a sustainable model for supporting the business without burning out their own team, a number unlikely to improve while the underlying data work still consumes the bulk of the week. 

This is exactly where Mercur earns its place for a technology finance team. It plans and models ARR waterfalls, net and gross revenue retention, and Rule of 40 scenarios alongside the traditional profit and loss, with fast scenario simulation for cloud infrastructure cost, hiring plans and sales capacity changes run as a single connected model rather than three disconnected spreadsheets. Margin allocation rules split bundled, multi-year and usage-based contracts down to the cost-to-serve detail the Head of Business Control needs, and role-based self-service dashboards let revenue, product and go-to-market leaders see their own numbers directly. AARO supplies the consolidated, reconciled actuals Mercur plans against, which is what keeps the monthly ARR bridge honest rather than rebuilt from scratch each cycle. 

For a CFO, Head of FP&A or Head of Business Control running a technology business where the metric that matters most sits outside the general ledger, that is the practical shift: a planning model built around ARR and margin mix from day one, not bolted on top of a traditional budget template after the fact. 

Up next in Part 2: why revenue recognition and multi-entity structure are now the two places technology finance teams are most likely to get caught out at close, and what a modern close actually looks like.